Continuous-fiber composite 3D printing.
Workholding and line tooling built from your model or design in four published composite materials: one first article against your agreed critical dimensions, one defined revision. Production start is confirmed with your quote; our internal target is within one business day of approval. $0 tooling, no minimums, 60-day make-it-right on every job.
See what each material changes.
Select a material to compare the same part, its relative performance shape, and published values. Final construction still follows geometry, load path, heat, wear, and failure consequence.
Process and build envelope.
One printer, one continuous-fiber process, published specifications.
What it is for.
Production tooling leads. End-use parts run in the same composite stack when you need parts, not just the tools that make them.
How a print job runs.
One studio handles the whole path. No layers between you and the person running the build.
Send a file or a part
Any file works: CAD (STEP, STL, IGES, or native formats), a PDF drawing, a photo, even a phone picture of a sketch. No file? Ship the part and the studio scans it first.
DFM pre-flight
Fit to the build envelope, wall-thickness and overhang checks, and a fiber-placement plan before the first layer.
15-minute quote
The finished design, material, reinforcement, quantity, and service tier build the quote, priced within 15 minutes during business hours. Engineering review confirms final construction.
Fabrication
Continuous-fiber composite printing at 100-micron resolution. Production start is confirmed with your quote: our internal target is within one business day of approval.
Inspect and ship
Dimensional and visual verification against spec, then packed and shipped to your floor.
Send the design.
Send any file, or ship the part. Custom tooling is quoted within 15 minutes during business hours and gets a same-business-day engineering review; production start is confirmed with your quote. No file yet? Describe the problem or ask us to call.